Relining requests should be reported to Council Connect for
inspection.
New road markings can be requested through Council Connect.
Gullies and their immediate pipe connection are emptied and
cleansed as part of an annual proactive maintenance programme.
If a Gully cover is broken, collapsing, missing or dropped into
its hole, and so is a danger, this should be reported immediately
to Council Connect.
A pothole is a sharp edged depression in the carriageway greater
than 30mm deep. The severity of a pothole is determined by the risk
it poses to road users. This is difficult to judge since all
potholes present some risk. Potholes this should be reported
immediately to Council Connect.
Any urgent complaints about roads should be
reported to the Council Connect on 01225 394041
immediately.
(back to
top)